Alpin Z300 8 Installation manual
Lehner Lifftechnik GmbH
Lower rollers
Fixing plate
Mechanical limit block
Fixing plate hook
Step 7:
Engaging the platform into the drive unit tower
Approach the platform
to the drive tower. If
possible use a jack lift to
put the platform at a
convenient working
height. Take off the
front cover of the
platform.
Take out the lower left
and right rollers on the
carriage, which are
screwed form the inside
of the carriage.
Drive up the carriage so
that the fixing plates of
the platform can pass
the mechanical limit
block.
Drive the platform in so
that the fixing plate
hook aling with the
roller fixing holes and
clear the mechnical limit
block