Alpin Z300 2 Installation manual
Lehner Lifftechnik GmbH
KEY PARTS:
The unit is delivered preassembled in 4 main parts:
Lift mast (column)
It is the fundamental and the largest piece of the equipment, consistent of the traction unit and
the main electric and control switches.
Height of the column is up to 5100 mm (for a 4m lifting height) and the weight ranges from
420 kg (2m lifting height) to 580 kg (4m lifting height)
Upper landing gate frame
The upper gate is supplied complete with a framed support structure acting as a sidewall.
Weight of this set ranges from 105 kg to 145 kg depending on the size of the lower frame.
Upper landing gate
with frame
Cover for
top of tower
Covers for gate
frame
Electric control box
Lift mast