Alpin Z300 5 Installation manual
Lehner Lifftechnik GmbH
On site requirements for installation:
As preliminary work, a concrete foundation for anchoring the bottom plate has to be created.
Please see below dimensions for solid foundation. It is always necessary to provide drainage
of rain water from the platform area.