46
_________________________________________________________________________________
20. PERFORMED SERVICES
It is advisable to write down all service operations that are included in the periodical service.
All services that have been made during the warranty period must be noted on the list below,
otherwise
t
he manufacturer’s warranty will void
. The service operations mentioned in the
maintenance schedule on chapter 15.1 shall be noted as follows:
First Service (50 hours),
100 hour Service, 200 hour / 1 Year Service etc.
#
Date
(dd.mm.yyyy)
Operating
Hours
Type of Service (e.g.
First service (50 h))
Notifications, additional repairs, etc.
1
2
3
4
5
6
7
8
9
10
11
12