
25
ώ
At the window of “Data Set”, click “Ups ID”, write a value for the parallel UPS ID
at the right side, such as “1”, then click “Set” as shown in below picture. If the UPS
sounds a “beep”, that means the setting is correct.
ώ
After setting the UPS needed to be paralleled, power off all the UPS. Connect all
the UPS according to “parallel cable installation”, and then power on the UPS.
CAUTION:
After changing the parallel system ID, the connection between
Muser4000 and equipment might be interrupted. If it occurs,
please re-connect in accordance with the instruction described
before.
CAUTION:
Parallel cable cannot be connected when setting the parallel
parameters.
Содержание STARK 10 kVA
Страница 51: ...51 ...
Страница 52: ...www informups com ...