Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l’ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
28
OMW07096 REV. E
The UPS must be so installed as to ensure its serviceability and to allow a correct air flow as much as
possible.
With regard to the minimum distances from the walls, for all of the UPS sizes the same installation
conditions apply as indicated in the table below.
- UPS with internal batteries
A (mm)
B (mm)
C (mm)
E* (mm)
D (mm)
Recommended clearances
50 1200 600
600
Minimum clearances
0
1200
600
400
E*
valid only with internal battery
- UPS with external battery cabinet
A (mm)
B (mm)
C (mm)
D (mm)
Recommended clearances
50 1200 400
600
Minimum
clearances
0 1200 0
400
The table below shows the air volume required for an optimal ventilation and cooling of the UPS.
Power (kVA)
60
80
Air volume (m
3
/h) 1100
1000
Содержание 311087
Страница 1: ...UPS OPERATING MANUAL MANUEL DE FONCTIONNEMENT DE L ASI MANUALE OPERATIVO UPS KEOR HPE 60 80 kVA ...
Страница 3: ......
Страница 5: ......
Страница 243: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS OMW07104 REV A 9 ENGLISH LANGUAGE ...
Страница 244: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 10 OMW07104 REV A ...
Страница 293: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS OMW07104 REV A 59 LANGUE FRANÇAIS ...
Страница 295: ......
Страница 345: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS OMW07104 REV A 111 LINGUA ITALIANA ...
Страница 346: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 112 OMW07104 REV A ...