4.6.1.1 Installation of external battery
1
Do not use internal and external battery together
If the battery cabinets not supplied by LEGRAND, it is the installer's
responsibility to check the electrical compatibility and the presence of
appropriate protection devices between the cabinet and KEOR HPE
11
111
Read the “section Installation” carefully, for assembly procedure of Battery
To avoid risk of electromagnetic interference, separate the battery cables from
Input and Output cables
1
LETHAL VOLATGE of nominal 720 VDC is present when the external battery
connection are made
11
Figure 48 – String configuration 2x30 blocks or 2x31 blocks of 12V VRLA batteries
Two Serial Strings with central point – Neutral Potential
Содержание 311087
Страница 1: ...UPS OPERATING MANUAL MANUEL DE FONCTIONNEMENT DE L ASI MANUALE OPERATIVO UPS KEOR HPE 60 80 kVA ...
Страница 3: ......
Страница 5: ......
Страница 243: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS OMW07104 REV A 9 ENGLISH LANGUAGE ...
Страница 244: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 10 OMW07104 REV A ...
Страница 293: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS OMW07104 REV A 59 LANGUE FRANÇAIS ...
Страница 295: ......
Страница 345: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS OMW07104 REV A 111 LINGUA ITALIANA ...
Страница 346: ...UPS user manual Manuel de l utilisateur de l ASI Utilizzo dell UPS 112 OMW07104 REV A ...