OPERATION
SECTION 3
OPERATING PROCEDURES
This section of the manual provides all the instructions
necessary to start and operate the 2RII Packmaster,
including specific instructions for loading, packing and
unloading the unit.
NOTE
It is important that operators and mechanics understand
these procedures.
PRE-OPERATING WALK-AROUND
INSPECTION
Each day, before starting the unit, perform the following
walk-around inspection.
1. Refer to the decal location illustration in Section 1,
SAFETY, of this manual and make sure all decals are in
place and readable. Replace any decals that are not.
NOTE
A decal kit, free of charge, is available from your local
authorized Leach distributor.
2. As you are checking for decals, also look for fluid
leaks on and around the unit. Check for fluid leaks at the
hydraulic cylinders, valves and fittings.
3. Inspect the mounting sills and attaching hardware.
Make sure everything is tight and that there are no bro-
ken or excessively worn parts. Check capscrews and
fasteners for looseness, visible welds for cracks and
control levers for each movement.
SPRINGS
3-6
Содержание 2R-II
Страница 1: ...2RII PACKMASTER OPERATORS MANUAL Over Serial Number 16000 BUILDING THE BEST...
Страница 2: ......
Страница 11: ...1 6 SAFETY PRECAUTIONS SECTION 1 1 4 2 5 6 3 7 8 9 10 7 7 9 1 8 4 5 2 6 10 1 3 1 6...
Страница 12: ...SAFETY PRECAUTIONS SECTION 1 2 1 3 4 5 1 2 3 4 5 1 7...
Страница 14: ...SAFETY PRECAUTIONS SECTION 1 11 12 13 14 15 16 17 18 19 20 21 22 23 1 9...
Страница 16: ...SAFETY PRECAUTIONS SECTION 1 1 11...
Страница 17: ......
Страница 25: ......
Страница 27: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 1 2 3 8 9 10 11 12 7 4 5 6 7 8 3 2...
Страница 46: ......
Страница 48: ......
Страница 49: ......