
“E
SPRESSO
P
OINT MOD
. M
ATINÈE
” 120 V
C
OD
. 83312 / R
EL
. 1.00 / F
EBRUARY
2003
3.1
2/4
Deliver y unit - chamber
maintenance
Disconnect the teflon pipe from the solenoid valve,
positioning the spanner as shown in the diagram,
pushing it upwards and manually extracting the
pipe.
By lifting the top plate it is possible to reach the
labyrinth in order to carry out the cleaning
operations and substitution of the seal (
A
).
It is also possible to extract the labyrinth to replace
the seal (
A
) shown in the diagram, positioned
between the labyrinth and the chamber cover.
C