L a u n c h T L T 2 6 0 A T T w o - p o s t l i f t u s e r ’ s m a n u a l
11
Fig 13
Key points for assembly: the two steel cables shall be adjusted to equal tension in order to ensure the
simultaneous movement of the two carriages.
10.2.7 Install the power unit
Use two M10 bolts and washers to fixing the power unit. After fixing the power unit. Fill the reservoir with hydraulic
oil .Operate carefully to avoid dust and other pollutants mixed with the hydraulic oil.
10.2.8 Connecting the power supply
Dismantle the sealing cover of the electrical box on the power unit and do the wiring according to the circuit diagram;
the power supply switch is required to be installed near the lift for convenient disconnecting the power supply during
maintenance or in case of emergency. The motor damage caused by wrong wiring is not warranted. Please contact
the manufacturer for the electrical issues. Ensure that the oil tank is full; don’t operate where there is no oil. After
pressing the start button, if the motor doesn’t run or the abnormal noise or heat occurs, the machine shall be
immediately stopped to check the correctness of the electrical connections.
Fig 14
Note
:
If the lift is used outdoors, it is recommended to set a
cover on the power unit; such damages to the
motors
During the installation, rubber cushions must be added
between the hydraulic station and the installation plate
Refer to the circuit
diagram attached with
the motor in order to
acquire the correct
wiring instruction
.
Start button
(Press to lift)
Lowering handle
(Press to lower)
Remove the
plastic plug from
here and install
one hydraulic
fitting