10.2.4 Install the top beam
Position the offside column at the designated chalk location.
Lift the top beam to its high position, and use bracket and
fasteners to fix it with the columns (as shown in Fig. 8).
When installing the top beam, ensure the above micro
switch support bracket adjacent to the power side column.
In Fig 12:The symmetric top pulleys are to be installed at
position 1
、
1
″
,asymmetric top pulleys are to be installed at
position1
、
1”
、
2
、
2”
Note: Since the offside column is not fixed to
the ground, you must operate carefully to avoid the
falling of the column.
Diagram of column, extension column and top beam
Fig 12
10.2.5 Install the offside column
Install the offside column as the procedures in10.2.3
.
10.2.6 Install and adjust the balancing steel
cables
Raise the two carriages to the safety locking position
and two carriages are of the same height from the floor.
Install the two steel cables as shown in Fig. 13.
Adjust the tension of cables through the adjustment nuts on
each end of steel cable. The steel cables should be tight in
equal tension. Each steel cable should be ensured in the
pulley when adjusting tightly, otherwise the steel cable will
be damaged.
Note
:
Before operating the lift, recheck to
balancing steel cables and ensure they are not
intersected or wrongly installed. Ensure that the