Models S 1200, S 2400, S 4400, POU 3300, POU 3500
-
7
-
2.2.
Unpacking and Handling
WARNING:
Heavy Load. The 3300 /2400 module weighs 25 kg (55 lb). The 3500/4400 module
weighs 38 kg (84 lbs). The power supply/ controller weighs up to 30 kg (66 lbs).
Lifting can cause muscle strain or back injury. Use lifting aids and proper lifting
techniques when installing, removing or replacing.
Unpack the unit carefully. Verify that all items checked on the packing slip are in the crate.
Inspect the unit for obvious physical damage. Contact LAUDA-Noah, LP Customer Support and
the carrier immediately if there are signs of shipping damage. Save the shipping container for
submitting necessary claims to the carrier.
Utilize the handles on the top of the unit for transport, and use a 2 person lift for the POU 3500
and S 4400.
2.3.
Site and Climate
The unit must be installed vertically, according to the markings on the side of the unit. We
recommend that the unit be located no more than 3.8m (12.5 ft) away from the temperature
control target.
The electrical protection degree of the unit is IP2X, indicating the unit is for indoor use only, with
no protection against water droplets.
Since the unit is liquid cooled, there are no requirements for spacing and ventilation. However,
accommodations must be made for the unit’s fluid and electrical connections. Do not position
the equipment so that it is difficult to access these connections.
Additionally, avoid installing the unit’s process loop through areas where someone may come
into contact with tubing/hose in order to reduce risk of burns.