Models S 1200, S 2400, S 4400, POU 3300, POU 3500
-
17
-
3.
Startup
After the unit has had both it’s fluid and electrical connections made, the unit must be filled
before operation. The 3300 and 2400 will require ~1.6L of perfluorinated fluid and the 3500 will
require ~3.0L, not including external plumbing, as well as a pressurized fill canister.
CAUTION:
Use only approved process fluids. Do
not
use water or a mixture of water and ethylene
glycol.
3.1.
Fill Procedure
Fill the canister with process fluid to the 2.0 liter mark. Do
not
top off. Leave room for air.
Connect the quick disconnect fitting on the fill canister's tube to the mating quick
disconnect fill port on the top of the module.
Pressurize the fill canister with its hand pump.