
TRENCHER
ATR 90
16
Precautions in Design
Moving parts on this machine, particularly bar, chain and auger, are located
beyond attendant’s reach. Main controls for machine operation are installed on the
carrier. While trenching, the attendant must remain in the intended attendant’s
workplace, i.e. usually the driver’s seat.
Use
Before Use
-
Before first putting the cutter into operation check up the entire
machine for completeness after transport. In case of any damage or
incompleteness contact your dealer or an authorised service point.
-
Exchange all damaged parts and use always original spare parts.
-
Check up all bolted joints, especially on the moving parts.
-
Keep all unauthorised persons or animals out of range of the machine while
working.
-
Do not put the chain bar on a hard base (concrete). For putting the bar aside,
use a wooden board.
-
Check up hydraulic lines for tightness and integrity.
-
Before coupling check up contact areas of quick-acting couplers. Clean them if
fouled.
Handling and Storage
-
When loading the trencher on a trailer, fasten retention chains, straps
or cables to the loading area. Let the chain bar rest on the floor carefully.
-
While handling you may use a lift truck or a tackle with min. carrying capacity
of 500 kg (suspension in the given lashing points only).
-
Store the trencher always in dry (sheltered) space to protect it against
weather effects.
-
Before storage clean all parts of the machine.
-
Exchange all damaged or worn parts. Use always original spare parts. For
servicing or spare parts contact your dealer or an authorised service.
-
Check up hydraulic hoses for wear. Replace them if necessary or every four
years at least!
Содержание ATR 90
Страница 1: ...Version 03 2017 OPERATING INSTRUCTIONS TRENCHER ATR 90...
Страница 4: ...TRENCHER ATR 90 4...
Страница 26: ...TRENCHER ATR 90 26 Appendices HYDRAULIC CIRCUIT Hydraulic circuit of this trencher...
Страница 28: ...TRENCHER ATR 90 28 Service Report...