TRENCHER
ATR 90
15
If uncoupled, you may use a lift truck or a tackle with min. carrying capacity
of 500 kg. Any suspension is allowed only in the given lashing points. It
applies also to lashing straps or other applicable lifting means.
If coupled, follow the instructions given in the separate manual of the
carrier.
Product Delivery
-
This product is delivered completely mounted and attached to a wooden pallet.
-
While handling you may use a lift truck or a tackle with min. carrying capacity
of 500 kg (suspension in the given lashing points only).
-
The manufacturer delivers this product shrink-wrapped. The protective foil
protects the machine against weather effects but in no case against mechanical
damage, fall etc. The protective foil is recyclable; dispose it according to valid
local regulations.
-
While putting the machine aside (e.g. at reloading) we recommend to place it
under a shelter.
-
While unloading put the product always on a solid and level surface.
-
It is not allowed to put it on a labile base.
-
It is not allowed to put any objects or tools on the machine or even to pile two
machines on each other.
Handling
After delivery unload the machine from the transport pallet as follows:
-
Cut the binding band carefully. Be aware, the band is tightened up and after
cutting its both ends may “shoot out”. While cutting the band, use protective
gloves and goggles.
-
Lift up the trencher slightly in order to remove the transport pallet and put it on
the ground. At lifting keep away from the place under the tackle/crane load.
-
For loading or unloading use lifting means with min. carrying capacity of 500
kg.
-
For coupling the trencher directly to a carrier, keep the following instructions.
Содержание ATR 90
Страница 1: ...Version 03 2017 OPERATING INSTRUCTIONS TRENCHER ATR 90...
Страница 4: ...TRENCHER ATR 90 4...
Страница 26: ...TRENCHER ATR 90 26 Appendices HYDRAULIC CIRCUIT Hydraulic circuit of this trencher...
Страница 28: ...TRENCHER ATR 90 28 Service Report...