43
Installing the System into the Rack
1.
Stretch both of the Inner Channels
out to their fullest extent. You will
hear a click sound when they are
fully stretched and stop.
2.
Hold the system with its front
facing you, lift the chassis and
gently engage the Rail Brackets on
the model while aligning them with
the slide-rail assemblies as shown
in the image, and then push the
system into the cabinet.
While pushing in the system, please
also push and hold the Rail Lock
tab on both Rail Brackets.
Click
The inner rail will click
when it is fully stretched.
Rail Lock
Содержание NCA-5520
Страница 16: ...16...
Страница 44: ...44 3 Fix the lock screws on the Ear Brackets to both front posts...
Страница 63: ...63 Super IO Configuration...
Страница 68: ...68 Status LED Configuration Feature Options Description Status LED OFF GREEN RED Configures Status LED color...
Страница 79: ...79 NVMe Configuration Network Stack Configuration...
Страница 86: ...86 Server ME Configuration...
Страница 89: ...89 Processor Configuration...
Страница 91: ...91 Per Socket Configuration Feature Options Description CPU Socket0 Configuration None None...
Страница 106: ...106 View System Event Log...