7
UNPACKING
Receiving the Melter
Upon receipt, check for freight damage, both visible and concealed. Visible
damage should be noted on the freight bill at the time of delivery and signed by the
carrier's agent. Concealed loss or damage means loss or damage, which does not
become apparent until the merchandise has been unpacked. If concealed loss or
damage is discovered upon unpacking, make a written request for inspection by the
carrier's agent within 15 days of delivery. All packing material should be kept for
inspection.
Do not return damaged merchandise to Star Manufacturing
Company. File your claim with the carrier.
Location
Prior to un-crating, move the melter as near to its intended location as practical.
The crating will help protect the unit from the physical damage normally associated
with moving it through hallways and doorways.
Un-crating
The melter will arrive completely assembled inside a wood frame and strapped to a
skid.
Cut the straps and remove the wood frame.
CAUTION:
THE UNIT IS EXTREMELY HEAVY. FOR SAFE
HANDLING, INSTALLER SHOULD OBTAIN HELP AS
NEEDED, OR EMPLOY APPROPRIATE MATERIALS
HANDLING EQUIPMENT (SUCH AS A FORKLIFT,
DOLLY, OR PALLET JACK) TO REMOVE THE UNIT
FROM THE SKID AND MOVE IT TO THE PLACE OF
INSTALLATION.
CAUTION:
ANY STAND, COUNTER OR OTHER DEVICE ON WHICH
THE MELTER WILL BE LOCATED MUST BE DESIGNED
TO SUPPORT THE WEIGHT OF THE MELTER.
CAUTION:
SHIPPING STRAPS ARE UNDER TENSION AND CAN
SNAP BACK WHEN CUT.
Remove the Melter from skid and place in intended location.
Содержание 124cm
Страница 16: ...16 WIRING DIAGRAM 124CM 136CM...
Страница 17: ...17 WIRING DIAGRAM 148CM...
Страница 23: ......