3-8
F-661-0321
Transporting on a Trailer
1. Remove the short (9" long) Transport Lock from
under the Wing Support and place it over the exposed
Transport Axle Cylinder Rod.
2. Insert Clevis Pin and Hair Pin Cotter.
3. Close the Fold Shut-off Valve completely, by backing
off Jam Nut and turn Valve CW until it bottoms.
Tighten Jam Nut.
4. Raise the Transport Axle to where the Center Roller
Axle and the Transport Axle Tires are both touching
the Trailer Deck.
5. Disconnect Drawbar from tractor.
6. Retract Telescoping Drawbar.
7. Disconnect (Quick Coupling) Hydraulic Hoses and
the Ag Harness from where the frame connects to the
Drawbar.
8. Remove Turnbuckle and the Drawbar Pins.
Figure 3-8: Trailer Transport Set-Up
9" Transport Lock Storage
Clevis Pin
Hair Pin
Cotter
Exposed Hydraulic
Cylinder Rod
Fold Shut-off
Cartridge
Jam Nut
Flow Control
9" Transport Lock Storage