![Landis+Gyr 3 SMETS2 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/landis-gyr/3-smets2/3-smets2_user-manual_673710074.webp)
74/143
Issue 1.2
Prepayment functionality
© Gyr
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Week ID
W1
Index
Date
Day Id
1
01.01.xxxx
S3
2
25.12.xxxx
S2
3
26.12.xxxx
S3
4
15.03.xxxx
S4
Table 8 Special day table operation
10.5.3.1 Current and future non-disablement switching tables
There are two complete sets of non-disablement switching tables
– current
and future.
Current non-disablement switching tables (sc Special day) are the
ones currently being used.
Futures non-disablement switching tables are configured in the background
for later use.
Two future dated commands control the activations of future switching
tables; one for the non-disablement schedule, and other for the associate
special day.
Future switching tables will be activated when the current date becomes
newer than the activation date.
10.5.3.2 Non-disablement switching parameters
To configure a complete non-disablement switching parameters, a new set
of (future) switching tables must be created along with the following data:
• Future schedule Table for non-disablement
• Future Special Day for non-disablement
• Future Dated command for non-disablement schedule
• Future Dated command for Special day for non-disablement Table.
10.6 Debt management
The meter supports two methods of debt collection.
Payment based debt: A debt to be recovered as a percentage of
payment
Time based debt: A debt to be recovered over a period of time
10.6.1 Payment based debt collection
A payment based debt collection takes place when the meter accepts a
new credit top-up via a token. It is taken as a percentage of the value
added to the credit.
The charge percentage collected can be configured at manufacture or via
HES command.
The meter has active and passive payment based debt registers, this
allows a new payment based charge object to be configured for use when a
new meter account is activated.
The debt register may be set to collect a debt amount through the payment
based collection process.