![Landis+Gyr 3 SMETS2 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/landis-gyr/3-smets2/3-smets2_user-manual_673710047.webp)
Installation and Commissioning
Issue 1.2
47/143
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
© Gyr
The meter provides two main methods of joining or re-joining the HAN:
Option 1
– Automatic process for initial installation (Preferred)
Option 2
– Manual process for use during initial installation
6.5.1
Option 1 - Automatic process (Recommended)
This is the recommended process for joining the HAN to enable successful
commissioning of the E470 SMETS2 device. The pairing & commissioning
process will be initiated by the installer using the supplier systems and has
been designed to be fully automated thereafter, assuming that there are no
communication issues or other failures during the end-to-end process.
The steps shown below describe the ‘happy path’ installation and show the
meter display at each point. A combination of indications on the meter
display and additional cues on the engineers’ field hand held devices will
provide updates on progress throughout the installation process. This
document also describes how the installation engineer can validate that a
meter has been properly commissioned and configured after the process
has been completed.
6.5.1.1
HAN Join & Commissioning Steps
Step
number
Step entry
action
Step
Description
Associated
Service
Request
Number
Display
1
Apply power
Powers up in
credit mode
default display
(not service
mode)
N/A
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
2
Auto-scan for
HAN
Meter
automatically
scans for the
availability of a
HAN on which
the device has
been whitelisted
for 1 hour (60
minutes).
N/A
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
3
Initiate
Installation
Field engineer
initiates the
installation
process on the
Hand Held
device which
triggers a
message from
Supplier
systems to
whitelist the
ESME device
SR8.11
–
Update HAN
Device Log
R a t e X X A c t I m p
0 0 0 0 0
import
kWh