Installation and Commissioning
Issue 1.2
49/143
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
© Gyr
c. The meter will continue to search for a network for one hour. If in
that time it fails to find a valid network to join then it will cease
searching until a power cycle is applied or the ‘HAN Join’
function is activated from the meter front panel.
2.
The meter sends a commissioning ping.
3.
The supplier signs and submits commissioning request.
The DCC inventory and mapping status is updated to "Commissioned".
4.
The meter authenticates the commissioning request.
5.
The meter synchronises to communications hub time. This can be
checked by navigating to the time display (see figure below and refer
to section 14.10).
D a t e
2 1 . 0 1 . 1 7
The date is shown in the value
field in format DD.MM.YY.
T i m e
1 5 : 2 0 : 5 5
The time is shown in the value field
in format HH:MM:SS
6.
The meter sends a commissioning confirmation to the data service
provider and to the network operator.
7.
The utility sends a command to configure the meter (e.g. for tariffs,
alert thresholds).
6.5.2
Option 2
– Manual HAN Join & Commissioning Process
It is recommended that the automatic process as described in Section 6.5.1
is used to join the meter to the HAN and commission the device. In the
event that the device is not successfully joined to the HAN during the 60
minute period that it automatically scans for a valid network, then the steps
described below can be followed to manually complete the process.
Note that it is also possible to leave and join the HAN using the Service
Menu
– see section 19.2 for details.
6.5.3
HAN Join & Commissioning Steps
The installed meter should be joined to a HAN and checked per the following procedure once the
communications hub has been installed as per Section 6.3.3:
Step
number
Step entry
action
Step Description
Display
1
Issue SR8.11
(CCS01)
Command
Issue the Service
Request to the comms
hub to whitelist the
relevant device(s)
Not applicable