Measuring connection
Connect the measurement cable to the
PipeCheck
plus
• Insert the supplied measurement cable
(
12
) into the reverse-polarity-protected
connection socket (
3
) on the device’s
front side until the plug lock is engaged.
The measurement cable is approx. 1 m
long and branches out around half way.
The red and green measurement lines con-
nect to the sensor wires of the pipe to be
3 / 12
measured.
The two black measurement lines are connected to the medium pipe separately
from each other using the pipe connection magnet (
13
).
All measuring lines are fitted with banana plugs. In order to make connections
easier alligator clips for the sensor wires and one pipe connection magnet (
13
)
are included.
Connect the measurement lines to the district heating
pipe
System visualisation
10
12
13