Pure Link
Vent
Assembly
To
Drain
Brine Water To Drain
Product Water To Carbonator,
Point Of Use (POU), or Delivery Pump
Carbonated
Water Out
Filtered Water To Inlet
IMPORTANT
Mount Units Higher
Than Carbonator Inlet
Pure Link Installation With Storage Unit
Tee Must Be
Left Open at Top
3/8 X 3/8 X 3/8 Tee
Storage Only
Vent
Assembly
Siphon Break
5
5. Replace cap fitting on “Return Water” port, ensuring it is fully seated.
6. Allow unit to fill and shut off. (Boost pump will stop operating and water flow to drain will
stop. The backflush feature is indicated by a slow drip.)
7. Discard sanitizing solution to drain.
8. Allow unit to fill and shut off.
9. Discard rinse solution to drain.
10. Repeat rinse procedure (Steps 8 and 9) two (2) times.
11. Allow unit to fill and shut off. Unit is now ready for Point of Use.
12. If applicable, reconnect 3 pin pump connector to power supply.
2. INSTALLATIONS
2.1
TYPES OF EQUIPMENT TO BE CONNECTED
•
FBD
•
Coffee Machine
•
Ice Tea (if installed)
•
Espresso Machine
•
Carbonator
•
Proofer
•
Ice Machine
•
Steamer
A. FBD and Carbonator Method
Gravity feed or remote pump system from Product Out port at the bottom of the Pure Link unit.
B. Coffee, Espresso, and Ice Tea Method
Use remote delivery pump kit. (Refer to Lancer Catalog or contact Lancer Customer Service.)
Figure 5
2.2
INSTALLATION OF A FOUR (4) GALLON STORAGE UNIT TO SYSTEM (PN 85-1330)
A. Receive and unpack storage unit (see Sections 1.1 and 1.2).
B. Mount to wall adjacent to the Pure Link Reverse Osmosis (RO) System and
at
same
height
.
The storage unit
must be
installed at the same height of the Pure Link RO system to ensure
proper filling and shutoff of both units.
C. Connect to Pure Link RO System and into system as shown in Figure 5.
2.3. INSTALLATION OF OPTIONAL EQUIPMENT
A. Installation of a two unit system with two storage units (see Figure 6).
B. Installation of an integrated delivery system (see Figure 7).