INLET WATER
TO STORAGE BAG
TO DRAIN
WATER OUT
WATER IN
TO STORAGE BAG
TO DRAIN
WATER OUT
7
3.1
FILTER REPLACEMENT
Periodic replacement of the sediment pre-filter and carbon block filter should be accomplished in
accordance with the manufacturer's instructions. Replacement of pre-filter and carbon block
cartridges should be scheduled as necessary with regard to filter size, feed water quality, and water
volume usage. Regular scheduled maintenance of the pre-filter is required to prevent premature
failure of Pure Link system components.
3.2
WATER QUALITY
Periodic water quality testing of the Product Water is recommended every six (6) months at a
minimum. When TDS reduction of system is less than 80% compared to untreated feed water,
Lancer recommends replacement of the Membrane Module(s). Sanitizing procedures should be
followed when necessary to reduce bacteria growth. See Section 1.12 of this Manual.
4. MEMBRANE REPLACEMENT INSTRUCTIONS
Single Membrane - Plumbing Diagram
Figure 8
Double Membrane - Plumbing Diagram
Figure 9
4.1
Disconnect electrical supply to Pure Link unit, if applicable.
4.2
Turn off water supply.
4.3
Drain water from storage bag.
4.4
Remove the five screws that secure the enclosure cover and remove cover (save screws for
reinstallation).
4.5
Remove 1/4" tubing from membrane module(s) by holding down color coded collet on membrane
port while pulling on tubing. Take care to note tube placement for reinstallation of replacement
membrane module(s).
NOTE:
Blue collet is feed water inlet, White collet is product water out, Red collet is brine water to drain.
Ensure that Flow Restrictor is properly seated in brine tube before insertion into red collet of
replacement membrane module. Flow Restrictor for single membrane unit is white, double
membrane unit is gray.
4.6
Remove membrane module(s) from mounting clips by firmly pulling out one end and then the other.
4.7
Install replacement membrane modules by firmly pressing into one mounting clip and then the other.
4.8
Reinstall 1/4" tubing to appropriate membrane ports. See Figures 8 and 9 for plumbing diagrams.
Ensure tubing is fully seated into fittings.
4.9
Turn on water supply and connect electrical supply, if applicable.
4.10
Check for leaks, and tighten connections if necessary.
4.11
Replace cover and secure with screws retained from Step 4.4 above.
Do not allow bag to fill above
top of bag shelf before cover is in place.