6.2 DOOR BOARD REPLACEMENT
A. Follow door removal procedure outlined above.
B. Remove five screws located on the back side of the door that secure the liner to the door shell,
and lift the front door shell enough to disconnect the door board harness. The door shell can
now be removed.
C. Remove the screws that secure the spiders onto the door board. Remove the door board by
lifting the back end up first, so it slips out of the front tabs holding it down.
D. Replace the door board and secure the spiders back on.
E. While supporting the bottom of the door shell with one hand, reconnect the door board to the
touch panel. This is best accomplished with the door closed and the top of the door shell angled
away from the unit.
F. Secure door shell to the door liner with the five screws that were removed in Step A.
6.3 DOOR SEAL REPLACEMENT
A. Grasp lip of door seal and gently pull the seal from the retaining slot in the back of the door
liner.
B. Lubricate the new seal with soapy water and insert of the retaining section of the seal (starting
first at each corner) into the slot in the door liner.
C. Slowly work the remaining sections of the gasket until the gasket is completely seated.
6.4 GAS STRUT REPLACEMENT
A. Open door.
B. Gently push upward on the door to relieve the door’s weight from the gas spring and slide the
pin out of the clevis that anchors the gas spring to the door. Rotate the gas spring down and out
of your way.
C. Remove pin that secures the gas spring to the top clevis, same as Step B.
D. Align the hole in the large end of the gas spring with the clevis that is mounted to the top of the
unit’s interior.
E. Insert the retaining pin.
F. Open the door fully to align the hole at the shaft end of the gas spring with the door mounted
clevis and insert the retaining pin.
6.5 CONDENSER FAN MOTOR REPLACEMENT
A. Unplug unit.
B. Remove the two screws that secure the top grill to the top cover, and remove grill.
C. Unplug harness connecting condenser motor to the ice bank control box.
D. Remove the four screws that mount the condenser fan to the deck, and remove the motor/fan
assembly.
E. Replacement is the reverse of removal.
6.6 AGITATOR MOTOR REPLACEMENT
A. Unplug unit and remove the grill from the top cover.
B. Remove the four screws that mount the condenser fan to the deck, and move the motor/fan
assembly out of the way.
C. Unplug harness connecting agitator motor to the ice bank control box.
E. Remove screws securing the motor bracket to the deck plate and withdraw the agitator motor
vertically until the propeller clears the deck.
F. Replacement is the reverse of removal.
6.7 ICE BANK CONTROLLER
A. Unplug unit.
B. Remove door.
C. Remove top cover.
D. Disconnect and remove the EIBC control box.
E. Disconnect and remove control from box.
F. Replacement is reversal of removal.
19
Содержание MOO
Страница 27: ...NOTES 27...
Страница 30: ...9 2 WATER CIRCUIT TANK ASSEMBLY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 30...
Страница 34: ...9 4 INTERNAL CABINET ASSEMBLY 1 2 3 4 5 6 7 8 9 6 10 11 12 10 13 14 34...
Страница 36: ...9 5 PUMP PLATFORM ASSEMBLY 1 2 3 4 5 6 8 9 10 7 36...
Страница 38: ...9 6 WRAPPER DOOR DRIP TRAY ASSEMBLY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 38...
Страница 41: ......
Страница 42: ...Lancer Corp 800 729 1500 Technical Support Warranty 800 729 1550 custserv lancercorp com lancercorp com...