3.4 PUMP CLEANING - DAILY/NIGHTLY
A. Open the pump door by squeezing red pump door latch and swing door to left.
B. Gently pull the silicon tube out of the plastic nozzle.
E. Shake out excess water, let pump air dry, then reinstall in unit.
4. OPERATING PRINCIPLES
4.1 WATER SYSTEM
Inlet water is plumbed through a 1/4 turn ball valve located behind the control box, through a coil
of tubing at the bottom of the water ice bath tank. The water is chilled to below 40°F and fed to two
outlets at the rear of the product compartment. Each outlet connects to a flow meter/solenoid valve
which operates the water flow and measures the amount of water to be dispensed.
4.2 CONCENTRATE DELIVERY SYSTEM
When the dispensing valve is activated, concentrate is drawn from the concentrate container and
through the check valve on the concentrate tube by a peristaltic pump. It is metered by volume and
pumped into the mixing nozzle where it combines with cold water.
4.3 REFRIGERATION SYSTEM
The unit has a “lift out” refrigeration deck. The compressor, condenser, fan and agitation motors,
evaporator, and ice bank control system are mounted on a common deck plate. The deck is
attached to the insulated tank assembly in the back of the unit above the water bath compartment.
A removable grill mounted to the top cover provides access to the deck components.
The refrigeration deck assembly can also be separated from the unit by first removing the door,
followed by removing the top cover of the unit. After removing the mounting hardware, the deck can
be lifted up and out of the unit.
The copper tube evaporator (mounted to the compressor deck and located in the water bath
compartment of a stainless steel insulated tank assembly) forms an ice bank that weighs
approximately 21 pounds. Water in the tank is continuously mixed by an agitator motor to maintain
a constant 32°F bath temperature and cool the water coil located at the bottom of the tank.
16
FIGURE 11
FIGURE 13
FIGURE 12
FIGURE 14
C. Remove the pump by pulling red latch.
D. Run under warm water for approximately 10 seconds while rotating the gear.
Содержание MOO
Страница 27: ...NOTES 27...
Страница 30: ...9 2 WATER CIRCUIT TANK ASSEMBLY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 30...
Страница 34: ...9 4 INTERNAL CABINET ASSEMBLY 1 2 3 4 5 6 7 8 9 6 10 11 12 10 13 14 34...
Страница 36: ...9 5 PUMP PLATFORM ASSEMBLY 1 2 3 4 5 6 8 9 10 7 36...
Страница 38: ...9 6 WRAPPER DOOR DRIP TRAY ASSEMBLY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 38...
Страница 41: ......
Страница 42: ...Lancer Corp 800 729 1500 Technical Support Warranty 800 729 1550 custserv lancercorp com lancercorp com...