3
Ground Source Heat Pumps Since 1983
Content
1. GENERAL INFORMATION
4
1.1. Safety precautions
4
1.2. Transportation
4
1.3. Installation area
4
1.4. Removing the packaging
5
1.5. Structure and operating principles
5
1.5.1. Structure
5
1.5.2. Operation
5
2. INSTALLATION
6
2.1. Before installation
6
2.2. Pipe-laying
6
2.3. Connecting the collector pipe
7
2.4. Filling and de-aeration of the ground loop
7
2.5. Boiler connection
9
2.6. Heating connection
10
2.7. Domestic water connection and circulation of water
10
2.8. HEPAC check list
10
2.9. Electrical installation
11
2.9.1. Main switch
11
2.9.2. Sensors
11
2.9.3. Actuators
12
2.10. Electricity check list
12
2.11. Operating switches
12
2.12. Before startup
12
2.13. Startup
12
3. USER INFORMATION
14
3.1. Lämpöässä settings
14
3.2. Care and maintenance
14
3.3. Troubleshooting
14
4. TECHNICAL SPECIFICATIONS
16
4.1. Chart
16
4.2. Space requirements
16
5. WARRANTY
17
6. APPENDIX
17