1. GENERAL INFORMATION

We  thank  you  for  your  confidence  in  our  products  and  congratulate  you  on  making  an  excellent  choice!  You  have 
selected a long-lasting and environmentally friendly Lämpöässä geothermal heat system. We hope that you will enjoy 
Lämpöässä’s heating system  which will give you peace of mind for decades. It is important to read the user and 
maintenance instructions carefully. Please retain this manual for future use and reference should problems occur.

1.1. Safety precautions

To ensure the Lämpöässä geothermal heat system operates in a trouble-free manner and in order to obtain the best 
operating efficiency, the system must be transported and installed in accordance with the instructions provided by the 
manufacturer. After installation is complete, the check list provided must be reviewed in order to minimise any  instal-
lation errors. The manufacturer shall not be responsible for any breakages of equipment which is not installed correctly 
or any costs incurred as a result of this.

The pipe and electrical installations for the Lämpöässä geothermal heating system can only be installed by qualified 
persons.  If  problems  occur  during  installation,  we  recommend  that  you  contact  your  retailer  or  our  maintenance 
department. The telephone number for the maintenance department can be found in the documents delivered with the 
Lämpöässä heat pump. Electrical connections for the installation of the Lämpöässä may only be set up by qualified 
electricians.

In Lämpöässä T and P models – to prevent a compressor breakdown – the compressor and water in the storage tank 
must be preheated for 6 hours before the heat pump is started for the first time. Press the motor protective switch down 
and  switch  on  the  power.  This  stops  the  compressor  starting  and  enables  the  electrical  immersion  to  heat  up  the 
compressor and water in the storage tank. The compressor can be started after 6 hours of preheating.

The warranty of the 

Lämpöässä T  

compressor is not  

valid if preheating  

is not carried out.

1.2. Transportation

The Lämpöässä heat pump must always be transported in a vertical position. If tilting the system is unavoidable, for 
example to pass through a doorway, it may only be tilted to the left side or back as seen from the front of the heat 
pump. The unit may be moved from beneath using a forklift, for example. Do not go underneath the equipment while 
it is being lifted!

A transportation platform is fastened on both sides of the heat pump using screws. When the screws on the platform 
are removed, the adjustable feet used for final installation can be found inside.

1.3. Installation area

We recommend that the Lämpöässä geothermal heat pump be installed in a warm space which has a floor drain. During 
installation and when filling of the ground loop, some geothermal fluid mixture may be splashed on the floor. Glycol/water mixture 
can be used as well. The chosen area does not have to be fireproof. The floor must be able to withstand the weight of the 
heat pump and a full water tank. The floor must also be sufficiently even, because the heat pump must be as level as 
possible. Final adjustments can be made using the adjustable feet underneath the equipment.

Содержание T 10-15

Страница 1: ...USER MANUAL L MP SS T P 10 31 L MP SS 5 2013 Ground Source Heat Pumps Since 1983 As Long As the Sun Exists Let Mother Earth Heat Your Home...

Страница 2: ...2 Ground Source Heat Pumps Since 1983...

Страница 3: ...ing and de aeration of the ground loop 7 2 5 Boiler connection 9 2 6 Heating connection 10 2 7 Domestic water connection and circulation of water 10 2 8 HEPAC check list 10 2 9 Electrical installation...

Страница 4: ...ians In L mp ss T and P models to prevent a compressor breakdown the compressor and water in the storage tank must be preheated for 6 hours before the heat pump is started for the first time Press the...

Страница 5: ...metres deep in the ground or at least 3 metres deep in water The bore well is normally 100 200 metres deep with a diameter of 140 165 mm The heat pump is used in the transfer of heat from the water a...

Страница 6: ...d sensors are included in the delivery the heat pump has been correctly fitted the assemblies on top of the heat pump are intact the fuse size is correct for the main fuse and the heat pump see techni...

Страница 7: ...mp ss T 21 31 L mp ss T 21 31 1 2 Collector pipe assemblies on the side Connect asseblies to the collector pipe with care 1 Collector pipe flow 1 uk 2 Collector pipe return 1 uk 1 2 2 4 Filling and de...

Страница 8: ...pes 7 Use the brine pump of the ground source heat pump to accelerate the circulation Turn the main switch Q1 and the heating switch S2 on Turn the switch S4 Auto 0 Maal mp to the position 0 compresso...

Страница 9: ...can be heard from the pipes Please note Deaeration usually takes several hours and helps ensure that all the air is removed from the system and that there are no malfunctions once the system is start...

Страница 10: ...piping through the water tank fill and deaerate the network until all the air has been removed and leave the pressure at 1 1 2 bar maximum values heating network 1 5 bar DHW network 9 bar 2 7 Domesti...

Страница 11: ...ay up the wall of the building near the corner A sensor should not be placed under a roof in a place protected from the wind or over a vent doors or windows where the temperature is not the normal out...

Страница 12: ...pump 1 S5 Heat distribution pump 2 S3 AUTO 0 MAAL MP S4 Condenser pump and magnetic valve QM1 Compressor QM2 Brine pump 2 12 Before startup Before startup check that the heating system has been connec...

Страница 13: ...l valves are in the closed position and that the intermediate valve is open The compressor runs for a little while and the steam pressure switch goes off There may still be air in the ground loop Deae...

Страница 14: ...measured value at the bottom and at the top of the water tank A minimum value is determined for each set value in the Set values section In practice consumption of hot water also starts the compressor...

Страница 15: ...aused a fault in the condenser causing the temperature to drop from the actual values The regulator must be replaced not under warranty The regulator motor has been set on manual and the regulation do...

Страница 16: ...or 0 C 4 2 Space requirements The heat pump requires 50mm more floor space to the side of assemblies than its external dimensions L mp ss T10 T31 and P10 31 geothermal heat pumps are 1 3 1 4 metres in...

Страница 17: ...d warranty certificate and a certificate signed by the user stating that the mechanic instructed the user on how to operate the equipment NOTICE THE WARRANTY OF THE L MP SS T COMPRESSOR IS NOT VALID I...

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...L MP SS is a registered trademark of Suomen L mp pumpputekniikka Oy All rights reserved Suomen L mp pumpputekniikka Oy Unikontie 2 FI 62100 LAPUA FINLAND www lampoassa com R...

Отзывы: