5 Commissioning
Issue EN 2022/05 PUK 6 Operating manual
32/56
Fig. 5.2 Adjusting electrode length with handpiece holding arm
Fig. 5.3 Electrode length adjustment
5.6
Connecting the handpiece
Screw the connector plug of the handpiece into the handpiece socket on the
front of the device. To do this, screw the nut on the handpiece connector
hand-tight as far as the thread will allow. This is important to ensure proper
electrical contact and that no gas can escape from the system.
5.7
Connecting the contact clamp
Insert the black contact clamp supplied into the left socket, marked plus.
5.8
Connecting optional accessories
The optional accessories (e.g. grinding motor or foot switch) are connected
via the M12 plug attached to the connection cable. The respective sockets
on the back of the device are colour-coded for this. Always tighten the plugs
only hand-tight.