3-5. STARTING THE WELDING PROCESS:
The device must be set up on a flat and stable surface; a
work table is best suitable.
•
Connect the control Panel (fig. 1) with the main device
(fig. 2), by using the connecting cable.
•
Insert the hand piece connector as straight as possible
into the socket (9) and by turn to the right carefully bolt
on (do it manually!)
•
Insert the connector of the clamp or pliers into one of
the sockets (10)
•
Remove the nozzle (20) of the hand piece (23) (by
pulling)
•
Loosen the electrode thread (22), insert the newly
sharpened tungsten electrode (21) and screw on tightly
(per hand - do not use a wrench) with the electrode
projecting approx. 5 – 8 mm out of the nozzle (Only
use original electrodes)
•
mount the nozzle
•
Plug the round plug for the eye protection system;
such as “Optic unit” or “Microscope” into the
connection socket (5) marked “Filter” located on the
front side of the device and secure it with the nut.
•
Attach the pressure controller to the protective gas
container after carefully reading the instructions (if
possible, use argon gas with a minimum of 99.9%, e.g.
“Argon 4.6”
or an inert gas mixture suitable for your
application)
•
Connect pressure tube, by using the quick
connectors, to the pressure controller and to the
gas connection (18) of housing backside
•
Open gas bottle valve and set the gas flow to 8
litres per minute
•
Plug in main plug
•
Switch “on” mains plug (16) - equipment
accomplishes self check
CAUTION
:
maximum operating pressure should be 4
bars / 58psi!
(Fig. 4)
20 21 22
23
IMPORTANT!
Consider also the operating instructions of the attached eye protective systems!
ATTENTION!
When welding with PIP 100, the welding base, the clamps and/or the pliers are live as soon as the mains master
switch is turned on. Make sure that these parts do not touch any electrically conductive or earthed parts such as
housing etc.