35
UK
The wiring scheme to be carried out by technician are:
— Power Supply Line
— Thermostats Line
— Eventual blocking lamp and/or hour-meter
WARNING:
- Do not invert the neutral with the phase.
- Make the connection to an effi cient earthing system.
- Bridge 3-8 on base is found only on versions withouth preheater.
1
2 2 3 4 5 6 7 8
101112
9
TR
M
MB
VE
FR
PR
Tm
2
FA
MA
TC-TA
TS
F
IG
B4
T2 T1 N
L1
S3
L
N
LS
N
N
CO
Z
H
PB
SC
Key
CO
Hour-meter (possible)
F
Fuse
FA
Anti-interference filter
FR
Photoresistance
IG
Main switch
LS
Lock-out warning light (possible)
MA
Control unit terminal board
MB
Burner motor
PB
Burner connector
PR
Preheater (only mod.R)
SC
Plug
TA-TC Boiler environment thermostat
TR
Ignition transformer
TS
Safety thermostat
Tm
Minimum thermostat
VE
Solenoid valve
WIRING DIAGRAM
ECO 3 - 3R - 3 ST 3 3 R ST - 5 N - 5 R N - 5 R N ST - 7 R
Содержание ECO 3
Страница 109: ...109 P RU 111 114 115 116 116 118 119 119 121 123 125 126 127 128 128 130 LAMBORGHINI CALORECLIMA 2004 108 CE 2006 95 CE...
Страница 110: ...110 P RU a...
Страница 111: ...111 P RU b c d CO2 CO2 CO2...
Страница 112: ...112 P RU 3 Lamborghini Calor S p A 24 24 10...
Страница 119: ...119 P RU 3 on 5 S 3 LMO 2 3 4 5 6 7 8 9 10...
Страница 121: ...121 P RU ECO 7 2 CM F FA FR IG MA MB MS TC TR TS Tmf 2 VE1 1 VE2 2...
Страница 122: ...122 P RU ECO 7 2 ECO 3 3R 3 ST 3 3 R ST 5 N 5 R N 5 R N ST 7 R 3 4 2 3 3 5 4 6 5 7 1 2...
Страница 124: ...124 P RU 1 2 3 4 12 11 14 7 14 R 10 18 10 20 1 2 3 4 5 6 7 8 ECO 7 2 ECO 3 3R 3 ST 3 3 R ST 5 N 5 R N 5 R N ST 7 R...
Страница 127: ...127 P RU A B CO2 CO2 CO2 Bacharach 2 BH BH ECO...
Страница 128: ...128 P RU C C1 a 1 b D D 10...
Страница 129: ...129 P RU a b a b c a b c a b a b a b c b c b b...
Страница 130: ......
Страница 131: ......