A
SSEMBLY
STAGE
# 4
Assemble R.O.M. &Press Arm Assembly to Upper Pulley Housing
Assembly Hardware Required:
#33
Button
Head
Allen
Screw
Qty.
1
#54
Nylon
Nut
Qty.
3
#48
Flat
Washer
Qty.
4
#57
Hardware
Cap
Qty.
2
#53 Cap
Mounting
Ring
Qty.
2
Assembly Description:
A) Align the pivot-boss of the
Range of Motion Assembly
(#8) with the shaft bearings of
Upper Pulley Housing (
#5)
and slide the
Pivot Shaft
(#27) through the both assemblies. Securely mount the shaft in place using 1-
Flat Washer
(#48), 1-
Cap Mounting Ring
(#53), 1-
Nylon Nut
(#54), and 1-
Hardware Cap
(#57) onto each side. (Reference
Figure # )
Assembly Note:
Once the Pivot Shaft is into position and properly aligned, securely tighten the set screws
on top of the pivot-boss of R.O.M
B) Pull out on t-handle pop-pin and guide the
Press Arm Assembly
(#9) into position over the R.O.M. Assembly (#8).
Allow the pop-pin to be positioned in one of adjustment holes of the R.O.M. Assembly. Align the upper mounting
holes of the
Press Arm Assembly
(#9) with middle pivot-boss of the R..O.M. Assembly and secure in place using
1-
Buttom Head Allen Screw
(#33), 2-
Flat Washers
(#48), and 1-
Nylon Nut
(#54). (Reference Figure # )
♦
Assembly Stage #4 completed
A
SSEMBLY
I
NSTRUCTION
P
AGE
11
27
8
67
53
57
54
5
Note: Tighten Set Screws to lock the Pivot Shaft in position
Figure #6
Figure #6
33
48
48
54
9
T-Handle Pop-Pin
Содержание LS 70
Страница 21: ......