A
SSEMBLY
S
TAGE
# 3
Attach Upper Pulley Housing to the Vertical Upright & Guide Rods
Assembly Hardware Required:
#37
Button Head Allen Screw
Qty. 3
#50
Flat Washer
Qty. 12
#40
Button
Head
Allen
Screw
Qty.
2
#55
Nylon
Nut
Qty.
5
#44
Button Head Allen Screw
Qty. 2
Assembly Description:
(2-Person Assembly is Recommended)
A) Align the associated mounting holes of the
Upper Pulley Housing
(#5) with the upper mounting holes of the
Vertical Upright
(#4). Loosely fasten the assemblies in place using side mounting hardware; 2-
Button Head Allen
Screws
(#37), 4-
Flat Washers
(#50) and 2-
Nylon Nuts
(#55), back to front mounting hardware; 2-
Button Head
Allen Screws
(#40), 4-
Flat Washers
(#50), and 2-
Nylon Nuts
(#55).
B) Align the rear mounting holes of the
Upper Pulley Housing
(#5) with the
Guide Rods
(#19) and securely fasten the
assemblies together using 2-
Button Head Allen Screws
(#44) and 2-
Flat Washers
(#50).
Assembly Note
: After
securing the guide rod mounting, go back and fully tighten the other mounting hardware.
C) Align the second-front mounting hole of
Upper Pulley Housing
(#5) with the bolt-through sleeve of the
Lat Bar
Holder
(#6) and secure the assemblies in place using 1-
Button Head Screw
(#37), 2-
Flat Washers
(#50), and
1-
Nylon Nut
(#55).
♦
Assembly Stage #3 completed
(Reference Figure #5)
A
SSEMBLY
I
NSTRUCTION
P
AGE
10
37
6
5
50
55
50
44
50
40
50
55
50
37
50
4
19
Figure #5
50
55
Содержание LS 70
Страница 21: ......