
JX|8 Sheartec:II Jointer \ Setup Assembling
17
Assembling
Machine Preparation and Setup:
1.
The machine may be supplied with four installed wheels (depending on model), two of which are
locking style (infeed side). Lock these two wheels, by turning the thumbscrew clockwise, when the
machine is placed and before operation (Fig. 4). Loosen the two thumbscrews when moving the
jointer.
FIGURE 4: WHEEL LOCKS
2.
Position
the Jointer Body on the Stand with the cutterhead pulley directly above and on the same side as
the motor pulley.
NOTE: Have help lifting and positioning the jointer body onto the stand! Or use a forklift as
described earlier.
FIGURE 5: ASSEMBLING JOINTER
Содержание Sheartec II JX 8
Страница 1: ...JX 8 Sheartec II Jointer Owner s Manual Owner s Manual MJ8X72P 0130...
Страница 21: ...JX 8 Sheartec II Jointer Setup Assembling 21 FIGURE 11 Fence Stope Locks...
Страница 36: ...34 JX 8 Sheartec II Jointer Wiring JX 8 ShearTec II MJ8X72E 0130...
Страница 37: ...JX 8 Sheartec II Jointer JX8 Sheartec II Parts 35 JX8 Sheartec II Parts Tables Components...
Страница 38: ...36 JX 8 Sheartec II Jointer Wiring Cutterhead Drivetrain...
Страница 39: ...JX 8 Sheartec II Jointer JX8 Sheartec II Parts 37 Fence...
Страница 40: ...38 JX 8 Sheartec II Jointer JX8 Sheartec II Parts Stand Motor...
Страница 46: ...JX 8 Sheartec II Jointer Warranty...