
Mobile Dust Cyclone Manual
28
39.
Lift the foot pedal bar. Align the
Octagon drum window to the
center point of the drum lid and
push the drum in. Lower the foot
pedal bar to seal the drum tight for
normal machine operation.
40.
Make sure when aligning the
drum that both the left and right-
side lift plates are over the topping
on the foot pedal bar assembly
before lifting the foot pedal bar up.
When not aligned, the drum will not
be fully sealed and will interfere
with the air flow.
41. Using the white plastic pin,
insert the sharp point into the top
end of the proximity sensor that is
on top of the drum lid. You will find
a small hole to on top where you
can turn clockwise or
counterclockwise.
※
Clockwise: Lower dust waste level
in drum (Less full drum)
※
Counterclockwise: Higher dust
waste level in drum (Fuller drum)
42. A qualified electrician must
open the junction box on the auto
clean motor and remove the strain
relief at the bottom. Take the
second motor cord leading from
the top upright support with the
control panel and insert into the
strain relief, connect the wires
according to the wiring diagrams
on page 10 & 11. Close and secure
the junction box after completing
the wiring.
Drum is aligned and locked
Drum not aligned
Содержание PFLUX2
Страница 12: ...Mobile Dust Cyclone Manual 11 CONTROL PANEL Figure 1A Control Panel...
Страница 40: ...Mobile Dust Cyclone Manual 39 EXPLODED VIEWS PARTS 2021 10 14 SECTION A Close up view...
Страница 41: ...Mobile Dust Cyclone Manual 40 SECTION B Close up view...
Страница 42: ...Mobile Dust Cyclone Manual 41 SECTION C Close up view...
Страница 43: ...Mobile Dust Cyclone Manual 42 SECTION D Close up view...
Страница 44: ...Mobile Dust Cyclone Manual 43...
Страница 50: ...Mobile Dust Cyclone Manual 49 2021 Laguna Tools 120221...