CHECK BOILER
1
ON
3
2
3
1
2
English
9 EN
$
Press the luminous main switch to turn
on the machine.
The preset working pressure must be
reached before the machine is ready
for use.
During this phase, the boilers (
only on
“HD / GT” machines
) are loaded and
the heating phase begins.
10. Day-to-day operation
USE
“Before setting the machine at work, make sure that:
• the main electric power switch is on;
• the mains water cock has been turned on".
11. Changing the water in the boiler
$
WATER CHANGE
Press the key
.
Press the key
SET
.
T h e f o l l o w i n g m e s s a g e w i l l b e
displayed: “
WATER CHANGE
”. The
water from the boiler will drain from the
KRWZDWHUQR]]OHFDRIWKH
total capacity).
Dispensing will stop automatically.
After the procedure, the machine will
return to its normal functions and the
ERLOHUZLOOEHUH¿OOHGZLWKIUHVFKZDWHU
1
3
2
02_M100_multi_ridotto.indd 9
11/03/2014 10:27:53
Содержание m100
Страница 2: ...00_M100_Cop indd 2 11 03 2014 10 23 48 ...
Страница 6: ...IV M100 1 6 11 8 9a 9 20 13 19 19 19 Tsb Tsn 12 35 15 23 01_M100_indice indd 4 11 03 2014 10 24 38 ...
Страница 12: ...X 01_M100_indice indd 10 11 03 2014 10 24 41 ...
Страница 167: ...00_M100_Cop indd 3 11 03 2014 10 23 48 ...