General Maintenance
25
6.
Finish cleaning the area with pressurized water.
Inspecting After Clean-up
Once you are finished cleaning the hopper area, inspect your work:
1.
Check the following components for proper working order and/or alignment:
• Rollers
• Cylinder pins
• Hoses, pipes, connections, and cylinders (for leaks, etc.)
• Bolts (for thightness)
• Hopper floor and sidewalls (for excessive wear)
Figure 3-8 Inside the hopper area
2.
After inspection, put the floating panel back in place (see Figure 3-5).
3.
Use the stepladder to get down.
4.
Retract the stepladder.
5.
Start the engine, engage the hydraulic system and fully retract the packer.
6.
Retract the lifting arm alongside the vehicle.
Packer
The A
UTOMIZER
V
ERSA
H
AND
™ packing system relies on a heavy-duty guiding system and high-
strength steel wear plates. Because the packing system is put to such intensive use (1,000 to
3,000
cycles per day), Labrie Environmental Group recommends that
operators
perform a daily visual
inspection of the packer and its components.
Maintenance personnel
must
perform weekly inspection and maintenance. Greasing all moving parts
on a daily basis is very important and proper adjustment of the proximity switches is mandatory,
especially on vehicles equipped with a multi-cycle feature. For more information on the lubrication
schedule, see
Side rail
Packer
cylinder
Roller
Содержание Automizer Versa Hand
Страница 1: ...AUTOMIZER VERSA HANDTM MAINTENANCE MANUAL...
Страница 2: ......
Страница 3: ...AUTOMIZER VERSA HAND MAINTENANCE MANUAL...
Страница 26: ...18 Safety...
Страница 89: ...Lubrication 81 Figure 4 11 Lubrication chart Automizer...
Страница 90: ...82 Lubrication Figure 4 12 Lubrication chart Versa Hand arm...
Страница 94: ...86 Lubrication Figure 4 18 Cylinder retaining ring Cylinder retaining ring...
Страница 95: ...Lubrication 87 Packer Lubrication Points...
Страница 96: ...88 Lubrication Hopper Door Hopper door latch Hopper door hinges...
Страница 105: ...Hydraulic System 97...
Страница 127: ...Hydraulic System 119 Figure 5 29 Detecting cylinder internal leaks 1 2 3 4 5 A A A...
Страница 128: ...120 Hydraulic System Main Hydraulic Schematic...
Страница 129: ...Hydraulic System 121 Hydraulic Schematic 96 Gallon Gripper...
Страница 130: ...122 Hydraulic System Hydraulic Schematic 300 Gallon Gripper...
Страница 131: ...Hydraulic System 123...
Страница 132: ...124 Hydraulic System...
Страница 137: ...Electrical System 129 Electrical Schematics Console 1...
Страница 138: ...130 Electrical System Console 2...
Страница 139: ...Electrical System 131 Arm Control...
Страница 140: ...132 Electrical System Chassis...
Страница 141: ...Electrical System 133 Main Body...
Страница 142: ...134 Electrical System Hopper...
Страница 143: ...Electrical System 135 Arm...
Страница 144: ...136 Electrical System...
Страница 151: ...Pneumatic System 143 Pneumatic System Schematic...
Страница 152: ...144 Pneumatic System...
Страница 155: ...Troubleshooting 147 Figure 8 4 Ball end hex wrench metric and SAE...
Страница 164: ...156 Troubleshooting Figure 8 9 Tailgate locking mechanism...
Страница 166: ...158 Troubleshooting...
Страница 174: ...166 Lifting Arm Figure 10 1 Mounting bolts Figure 10 2 Rollers and bearings Figure 10 3 Bolt locks Bearings Rollers...
Страница 189: ...Lifting Arm 181...