8.2 Example of containment
– single door
Isee
underfloor
operator
Control
panel
3 position switch to turn
automatic doors off when
manually locked
Double pole
switched
fused spur
230V AC -
5A
Floor box
Safety sensor and
transfer loop
Push pad -
internal
activation
Push pad -
external
activation
Safety
sensor/transfer loop
- cable 8 x 0.75mm
WARNING
–
The Adaptalok ATS conduit gland on the end of the motor box is IP rated, therefore
you must ensure you install the correct conduit to the gland and sufficient care must be taken when
terminating the conduit end and taking cables into the unit. Any water ingress may damage the unit,
appropriate materials and measures must be considered and taken. For any uncertainty regarding
recommended conduits contact www.adaptaflex.com
8.3 Control panel to floor operator wiring
As standard there are two cables that are required as standard that must be run inside the 20mm conduit from
the control panel to each floor drive.
1. Motor cable
– 2 core x 1.00mm2 –
*IMPORTANT* see section 12)
2.
Encoder cable
– 4 core x 0.5mm2 –
*IMPORTANT* see section 12)
These two cables are terminated in both the control box and floor unit.
Floor unit:
Motor cables
– Black & Red
Encoder cables
– Red, Black, Blue & Yellow
Control box from L-NEP LOGIC BOARD
Motor cables
– Motor plug – Red & Black
Encoder cables
– Encoder plug - Red, Black, Blue & Yellow
13