Product Service 1-800-522-7658
5
Original instructions
C
C
H
H
A
A
P
P
T
T
E
E
R
R
2
2
P
P
R
R
E
E
R
R
E
E
Q
Q
U
U
I
I
S
S
I
I
T
T
E
E
S
S
Before you install your laboratory fume hood, you need to prepare your site for
installation. Carefully examine the location where you intend to install your
hood. You must be certain that the area is level and of solid construction. In
addition, a dedicated source of electrical power must be located near the
installation site.
Carefully read this chapter to learn the requirements for your installation site:
The location requirements.
The support requirements.
The exhaust requirements.
The electrical power requirements.
The service line requirements.
The space requirements.
Refer to
Appendix B: Fiberglass 30 Hood
Dimensions
for complete fume hood
dimensions.
Refer to
Appendix C: Fiberglass 30 Hood Specifications
for complete laboratory
fume hood electrical and environmental conditions, specifications and
requirements.
If the unit is not operated as specified in this manual it may
impair the protection provided by the unit.
Si l'unité n'est pas utilisée comme spécifié dans ce manuel il
peut diminuer la protection fournie par l'unité.
!
Содержание Fiberglass 30 Series
Страница 1: ...Fiberglass 30 Laboratory Fume Hoods Models 3030000 3030001 3030002 3030003 3030004 3030005...
Страница 43: ...Appendix B Fiberglass 30 Hood Dimensions Product Service 1 800 522 7658 39 Original instructions Figure B 2...
Страница 46: ...Appendix B Fiberglass 30 Hood Dimensions Product Service 1 800 522 7658 42 Original instructions Figure B 5...
Страница 48: ...Appendix C Fiberglass 30 Specifications Product Service 1 800 522 7658 44 Original instructions...
Страница 49: ...Appendix C Fiberglass 30 Specifications Product Service 1 800 522 7658 45 Original instructions...