2A. System Start-up

1.

Verify that the pump system is operating
properly:

a.

Shut off the manual gas valve located
outside the boiler.

b.

Raise the wall thermostat high enough to
call for heat.

c.

The pump should come on immediately. If
it does not, test the electrical circuits.

2.

Pilot and Main Burner Lighting:

a.

The JVH and JVP boilers do not require
manual lighting. The pilot is controlled by
the automatic ignition system.

b.

Different models of the JVi boiler utilize
various gas valves, (see Table 11).
Although the gas valves may have different
control knobs, they are all similar in
operation.

c.

Understand and follow the operating
instructions, on page 14, that are applicable
to the type of ignition system installed on
the boiler.

3.

The pilot and main burners will automatically
ignite when there is a call for heat.

2B. Sequence of Operation

1.

Wall thermostat will call for heat.

2.

Pump relay will turn on the circulating pump.

3.

If water temperature is below the limit setting,
the inducer motor relay will turn on the draft
inducer.

4.

Pressure switch will sense the fan (inducer)
operation and send 24 volts to the flame rollout
switch.

5.

In normal conditions, the flame rollout switch
will be in a closed position.
a.

JVH (Hot surface pilot ignition):
24 volts will be sent to the gas valve/
controller, the igniter will glow and the
pilot valve will open, lighting the pilot.

b.

JVP (Spark ignition):
24 volts will be sent to the ignition
controller, the igniter will spark and the
pilot valve will open, lighting the pilot.

6.

After pilot is proven to be lit, the main gas valve
will open, the main burners will ignite and
continue until either the hi-limit or wall
thermostat opens.

7.

When the wall thermostat is satisfied, the burners
will shut off. The relays will turn off the
circulating pump and the draft inducer. When the
room temperature falls below the wall thermostat
setting, the cycle will repeat.

Boiler

Size

Firing Systems

Natural or Propane

Valve

Number

Manufacturer

50-225

Hot Surface Pilot,

JVH

SV9500 &

SV9600

Honeywell

Spark Ignition,

JVP

VR8304

Honeywell

Table 11. Gas Valve Identification.

Содержание Mini-Therm JVi JVH

Страница 1: ...l is not followed exactly a fire or explosion may result causing property damage personal injury or loss of life Do not store or use gasoline or other flammable vapors and liquids in the vicinity of t...

Страница 2: ...bustion Air Supply 5 1H Venting 6 1H 1 Vertical Venting Category I 7 1H 2 Horizontal Venting Category III 8 1H 3 Common Venting System 9 1I Water Piping of Boiler System 10 1I 1 By Pass Piping 10 1J C...

Страница 3: ...elected to provide for correct system design water temperature rise Table 2 details temperature rise and water flow for the Mini Therm boilers SECTION 1 General Information WARNING The JVi induced dra...

Страница 4: ...to be installed in a garage all burners and burner ignition devices must have a minimum 18 457mm clearance above the floor 4 The Model JVi 50 through JVi 225 boilers can be installed in a closet as lo...

Страница 5: ...the surrounding area as outlined in the latest edition of C B 2 4 6 1 A DRAIN 11 8 298 6 152 7 178 24 610 REF INDUCED DRAFT BLOWER MOTOR PULL OUT GAS MANIFOLD BURNER TRAY TEMP PRESSURE GAUGE TEMPERATU...

Страница 6: ...an is used to supply air to the boiler room the installer should make sure it does not create drafts which could cause nuisance shutdowns If a blower is necessary to provide adequate combustion air to...

Страница 7: ...ached to it Do not weld the vent pipe to the boiler collar The weight of the stack must not rest on the boiler The boiler top must be easily removable for normal boiler service and inspection Avoid te...

Страница 8: ...ing of 400 F 204 C see Table 9 for a list of approved sealing materials Use at least three corrosion resistant screws at each slip joint when required Description Manufacturer Product High Temperature...

Страница 9: ...onnected to the common venting system are located and other spaces of the building Turn on clothes dryers and any gas burning appliance not connected to the common venting system Turn bathroom exhaust...

Страница 10: ...to expansion and contraction of copper pipe consideration should be given to the type of hangers used Rigid hangers could transmit noise through the system caused by the piping sliding in the hangers...

Страница 11: ...Mini Therm JVi Page 11...

Страница 12: ...w switch it should be wired in series with the high limit switch The boiler will not fire unless the pump is running and the flow switch is closed Field installed safety devices and operating controll...

Страница 13: ...Mini Therm JVi Page 13 Figure 11 Wiring Diagram JVP Figure 10 Wiring Diagram JVH...

Страница 14: ...primary secondary pumping Connect to W in lieu of A Boiler relay is used for boiler pump and connection to W will energize boiler pump when any zone is calling for heat Wiring with Taco Zone Valves W...

Страница 15: ...ing these instructions Figure 15 Main Burner Pilot Flame Pattern SECTION 2 Operating Procedures Before placing the boiler in operation check and reset the safety shutoff devices Once the boiler is con...

Страница 16: ...f water temperature is below the limit setting the inducer motor relay will turn on the draft inducer 4 Pressure switch will sense the fan inducer operation and send 24 volts to the flame rollout swit...

Страница 17: ...ll next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch do not use any pho...

Страница 18: ...ft side of the heater which must be removed to drain that side Both sides must be drained 10 The gas and electric controls on the boiler are engineered for long life and dependable operation but the s...

Страница 19: ...on the terminal board and from the orange wire terminal on the pump relay to the W connection on the terminal board If no output is found the connections or the pump relay could be defective 6 Place...

Страница 20: ...gh boiler Check temperature rise between inlet and outlet boiler piping 15 F 8 C to 25 F 14 C temperature rise is recommended If temperature rise is over 25 F 14 C increase pipe size or pump capacity...

Страница 21: ...ER UNPLUG IGNITER MEASURE VOLTAGE AT TWO BOTTOM TERMINAL OF SV9501 SV9601 24 VAC NOMINAL YES YES YES YES YES NO NO NO YES NO NO NO Troubleshooting Honeywell SV9501 SV9601 Hot Surface Pilot System REPL...

Страница 22: ...ked Check electrical connections between module and pilot operator on gas control Check for 24 Vac across PV MV PV terminals on module If voltage is okay replace gas valve if not replace module Check...

Страница 23: ...Also known as radiation Isolation Valve Used to isolate the boiler from the circuit It minimizes the amount of water drained from the system Primary Secondary Piping Two or more interconnecting circu...

Страница 24: ...032900 L0032900 L0032900 L0032900 L0032900 L0032900 L0032800 L0032800 L0032800 L0032800 L0032800 L0032800 L0032700 L0032700 L0032700 L0032700 L0032700 L0032700 L0052601 L0052601 L0052602 L0052602 L005...

Страница 25: ...0032900 L0032900 L0032800 L0032800 L0032800 L0032800 L0032800 L0032800 L0032700 L0032700 L0032800 L0032800 L0032800 L0032800 L0052604 L0052604 LD052605 LD052605 LD052605 LD052605 E0088400 E0088400 E00...

Страница 26: ...4 Tee 1 2 Coupling Model 50 100 1 2 Close Nipple Front Panel Insulation Items 13 14 15 and 30 are not shown 18 19 17 24 29 39 42 16 22 21 26 34 2 6 1 11 5 37 4 3 41 40 Rear Panel Insulation 12 36 7 7...

Страница 27: ...Mini Therm JVi Page 27...

Страница 28: ...CA 93021 805 529 2000 FAX 805 529 5934 20 Industrial Way Rochester NH 03867 603 335 6300 FAX 603 335 3355 480 S Service Road West Oakville Ontario Canada L6K 2H4 905 844 8233 FAX 905 844 2635 www laar...

Отзывы: