![background image](http://html1.mh-extra.com/html/la-monferrina/g2/g2_user-and-maintenance-manual_3113433027.webp)
IMPERIA & MONFERRINA S.p.A.
Installation
G2
23
GB
If the conveyor belt moves in the
opposite direction,
press the
“STOP/EMERGENCY” button 3
immediately thereby stopping the
machine.
STOP
Remove the power supply plug from
the socket and swap the position of
the brown and black wires as shown
in the figure.
The yellow-green ground wire must
never be removed.
You are recommended to get an
electrician to perform this
operation.
Safety microswitch check
Ensure that the microswitch is operating correctly at regular intervals.
Start the machine following the procedure describe above.
Open the lid to the mixing tank: the machine should stop.
If the machine does not stop when the lid is raised, do not proceed with
the work cycle and contact an authorised “La Monferrina” technician.
Blue
Brown
Yellow/
Green
Black
Содержание G2
Страница 2: ......
Страница 28: ...Installation IMPERIA MONFERRINA S p A 24 G2 GB PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...Maintenance IMPERIA MONFERRINA S p A 40 G2 GB Notes...
Страница 47: ...IMPERIA MONFERRINA S p A Spare parts G2 43 GB Table 1...
Страница 51: ...IMPERIA MONFERRINA S p A Spare parts G2 47 GB Table 2...
Страница 56: ...Wiring diagram IMPERIA MONFERRINA S p A 52 G2 GB Wiring diagram 220V single phase...
Страница 57: ...IMPERIA MONFERRINA S p A Wiring diagram G2 53 GB Wiring diagram 380V three phase...
Страница 58: ...Wiring diagram IMPERIA MONFERRINA S p A 54 G2 GB PAGE INTENTIONALLY LEFT BLANK...