IMPERIA & MONFERRINA S.p.A.
Maintenance
G2
33
GB
Caution!
The main switch is to be set on “0” and fastened with a padlock to
prevent accidental re-powering.
The key of the padlock is to be kept by the maintenance engineer..
Upon termination, and before putting back into service, the maintenance
engineer is to check the complete work cycle, the functioning of the safety
devices and that the protections are intact.
Work on motors or other electrical components is only to be carried out by
the Maintenance Engineer who has been specifically trained and
authorised by the Safety Officer.
Caution!
After every maintenance operation the Safety Officer shall check the
machine safety conditions and protection devices.
During maintenance operations it is recommended to affix on the control
panel a notice warning not to power-on or carry out movements
Maximum reliability and minimum maintenance costs of the machine are
the result of a planned and scrupulously followed maintenance and
inspection schedule to be observed during the entire life of the machine.
Always scrupulously observe the set maintenance time scales and
arrange the operations according to the specific needs, taking into
consideration the machine production cycle.
Always use equipment that is in perfect condition and specifically for the
operation to be carried out. The use of inappropriate and/or inefficient
equipment can cause serious damage.
Never intervene, unless specifically required to remove a failure, on
regulations and positions of limit microswitches: tampering with them can
cause serious damage to the machine.
Mark the separate parts when disassembling, to ensure correct
reassembly.
Before fitting a group, always spread a thin film of oil on internal parts and
matching surfaces. Replace all seals and gaskets with original spares
before mounting the components.
Always make sure there is ground connection and that it is in compliance
with current standards.
Before starting-up the machine always make sure that the maintenance
operators are at a safe distance and that no tools or material has been left
near the machine.
Содержание G2
Страница 2: ......
Страница 28: ...Installation IMPERIA MONFERRINA S p A 24 G2 GB PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...Maintenance IMPERIA MONFERRINA S p A 40 G2 GB Notes...
Страница 47: ...IMPERIA MONFERRINA S p A Spare parts G2 43 GB Table 1...
Страница 51: ...IMPERIA MONFERRINA S p A Spare parts G2 47 GB Table 2...
Страница 56: ...Wiring diagram IMPERIA MONFERRINA S p A 52 G2 GB Wiring diagram 220V single phase...
Страница 57: ...IMPERIA MONFERRINA S p A Wiring diagram G2 53 GB Wiring diagram 380V three phase...
Страница 58: ...Wiring diagram IMPERIA MONFERRINA S p A 54 G2 GB PAGE INTENTIONALLY LEFT BLANK...