![background image](http://html1.mh-extra.com/html/la-monferrina/g2/g2_user-and-maintenance-manual_3113433024.webp)
Installation
IMPERIA & MONFERRINA S.p.A.
20
G2
GB
Positioning
Warning!
Before commencing with the placement of the machine, a careful
visual inspection must be carried out to identify any damage that
could have occurred during transport.
In the case where one or more components show signs of damage, it is
essential to halt the installation, inform the manufacturer about the fault
discovered and agree on a plan for corrective action with him.
If it is properly blocked on the two wheels in a stable manner while
operating, the machine will function within the anticipated technical
parameters.
Position the machine on a perfectly level board.
Instructions for the proper slinging and lifting of the machine are supplied
directly
by “La Monferrina” to those persons authorised to carry out such
operations.
When cleaning, the persons assigned to these operations are to be
equipped with the necessary personal protection devices.
Caution!
Electrical connections are to be carried out by skilled experts who
have been appropriately trained.
Содержание G2
Страница 2: ......
Страница 28: ...Installation IMPERIA MONFERRINA S p A 24 G2 GB PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...Maintenance IMPERIA MONFERRINA S p A 40 G2 GB Notes...
Страница 47: ...IMPERIA MONFERRINA S p A Spare parts G2 43 GB Table 1...
Страница 51: ...IMPERIA MONFERRINA S p A Spare parts G2 47 GB Table 2...
Страница 56: ...Wiring diagram IMPERIA MONFERRINA S p A 52 G2 GB Wiring diagram 220V single phase...
Страница 57: ...IMPERIA MONFERRINA S p A Wiring diagram G2 53 GB Wiring diagram 380V three phase...
Страница 58: ...Wiring diagram IMPERIA MONFERRINA S p A 54 G2 GB PAGE INTENTIONALLY LEFT BLANK...