EN
119
Display
Operating Procedure
Description
“Technical” Programming
Press Water Button
Enter when Empty
Wait for Steam
Boiler Autofill
Press the hot water button to start draining the water contained in the steam boiler. Press the T3 button when
the boiler is empty, wait for refilling completion.
Reset Water Valve
Enter when Done
Drain Steam
Boiler Completed
Manually reopen the mixing valve and press the T3 button.
Now the procedure to renew or “regenerate” the water inside the steam boiler is completed
Steam Boiler
Exit
13
Press the T3 button to return to the “Technical” programming.
14
Press T1 or T2 to continue with the programming of the other parameters.
Steam Boiler
Enter Password
******
Steam Boiler
Settings