English
6 EN
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-levelling device is working properly.
•
The expansion valves are working properly
GROUPS
•
Hook up the
¿
lter holders to the groups (without coffee).
•
Let each group dispense water for about a minute.
HOT WATER
•
GT - HD
: continuously dispense hot water (pressing the appropriate button) until at least 5 litres of water have been
used.
DT
: continuously dispense hot water (pressing the appropriate button) until at least 5 litres of water have been
dispensed for a machine with 2 groups, 8 litres for a machine with 3 groups and 10 litres for a machine with 4 groups.
See the “Hot water dispensing” chapter in the User’s Manual.
STEAM
(also with Turbosteam)
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
TURBO MILK
(where applicable)
•
After removing the intake tube from the milk container, carry out a few test cycles.
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
.
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
5. Installation Check-up
Содержание M100 Attiva GTA
Страница 4: ...M100 1 6 11 8 9a 9 20 13 19 19 19 15 23 Cold Touch Turbomilk 9c Tsn 12 35 Tsb 9b II ...
Страница 87: ......