![L-Acoustics KIVA II Скачать руководство пользователя страница 73](http://html.mh-extra.com/html/l-acoustics/kiva-ii/kiva-ii_owners-manual_664712073.webp)
Rigging procedures
Stacking
Stacking Kiva II on SB15m
type of deployment
stacking
rigging accessory
KIBU-SB
min number of operators
1
Additional safety
Secure the stack with straps.
Risk of falling objects
Verify that no unattached items remain on the array.
Cardioid conguration
A cardioid conguration is an array of four subwoofers with one reversed element.
Refer to the subwoofer user manual and to the
Cardioid congurations
technical bulletin for details about the
use of this conguration.
Any of the following subwoofer arrays can be set in cardioid conguration.
Assembly
About this task
To ground-stack Kiva II on KIBU-SB, start at step
(p.74).
Procedure
1.
Prepare a stack of SB15m.
Secure the coupling bars with the locking tabs.
CLICK !
Make sure the safety label on each locking tab is fully covered.
Make sure the lugs are in the notches.
2.
Secure KIBU-SB on top of the SB15m stack.
Use the KIBU-SB coupling bars.
Kiva II owner's manual (EN) version 1.0
73
Содержание KIVA II
Страница 1: ...KIVA II owner s manual EN ...
Страница 115: ...Corrective maintenance 4 Secure the plate x10 T30 Kiva II owner s manual EN version 1 0 115 ...
Страница 135: ...Speci cations SB15m dimensions 520 mm 20 5 in 439 mm 17 3 in 580 mm 22 8 in Kiva II owner s manual EN version 1 0 135 ...
Страница 137: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kiva II owner s manual EN version 1 0 137 ...
Страница 139: ...Speci cations SB18i dimensions 700 mm 27 6 in 543 mm 21 4 in 713 mm 28 1 in Kiva II owner s manual EN version 1 0 139 ...
Страница 141: ...Speci cations SB18m dimensions 717 mm 28 2 in 543 mm 21 4 in 759 mm 29 9 in Kiva II owner s manual EN version 1 0 141 ...