Rigging procedures
Assembly
Procedure
1.
Secure KIBU-SB on SB15m.
Use the coupling bars provided with the KIBU-SB.
Secure the coupling bars with the locking tabs.
CLICK !
Make sure the safety label on each locking tab is fully covered.
Make sure the lugs are in the notches.
2.
Lift the array.
3.
Position a SB15m under the assembly.
4.
Lower the array until it rests on the subwoofer
5.
Secure the SB15m under the array.
Use the coupling bars from the top subwoofer.
Secure the coupling bars with the locking tabs.
Kiva II owner's manual (EN) version 1.0
59
Содержание KIVA II
Страница 1: ...KIVA II owner s manual EN ...
Страница 115: ...Corrective maintenance 4 Secure the plate x10 T30 Kiva II owner s manual EN version 1 0 115 ...
Страница 135: ...Speci cations SB15m dimensions 520 mm 20 5 in 439 mm 17 3 in 580 mm 22 8 in Kiva II owner s manual EN version 1 0 135 ...
Страница 137: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kiva II owner s manual EN version 1 0 137 ...
Страница 139: ...Speci cations SB18i dimensions 700 mm 27 6 in 543 mm 21 4 in 713 mm 28 1 in Kiva II owner s manual EN version 1 0 139 ...
Страница 141: ...Speci cations SB18m dimensions 717 mm 28 2 in 543 mm 21 4 in 759 mm 29 9 in Kiva II owner s manual EN version 1 0 141 ...