2PX/2PY-1
1-5-74
(Attaching the new ISU)
57. Fold the FFC wire of the new ISU with
the alignment to the right.
(1)Fold the FFC wire in 90 degrees at
300mm from Alignment
G
at the edge of
the holder passing the FFC wire to make
Alignment
H
.
(Or, fold it in 90 degrees on the line con-
necting the Alignment
H
and Alignment
H'
at 33mm from
H
.)
(2)Fold it in 90 degrees at Alignment
I
at
135mm from the Alignment
H'
to make
Alignment
J
.
(3)Fold the FFC wire in 180 degrees at the
Alignment
J
.
(The reference length from the
Alignment
J
to the wire's edge is about
195mm.)
(4)Unfold the FFC wire to easily pass the
FFC wire through the ferrite core at the
next step.
Figure 1-5-119
58. Pass the ISU's FFC wire through the
ferrite core affixed on the scanner frame
and then pass its edge through the
aperture in the center of the scanner
frame.
Figure 1-5-120
G
G
G
300mm (+/-1mm)
H
33mm (+/-1mm)
135mm
(+/-1mm)
I
J
H'
J
180 degrees
About 195mm
Ferrite core
FFC wire
Aperture
Содержание 6026
Страница 1: ...SERVICE MANUAL Published in March 2014 842PY112 2PYSM062 Rev 2 ECOSYS M6026cidn ECOSYS M6526cidn ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 134: ...2PX 2PY 1 3 96 This page is intentionally left blank ...
Страница 237: ...2PX 2PY 1 5 51 9 Remove the scanner unit Figure 1 5 78 Scanner unit ...
Страница 275: ...2PX 2PY 1 5 89 4 Remove the paper conveying unit Figure 1 5 145 Paper conveying unit 1 2 2 ...
Страница 280: ...2PX 2PY 1 5 94 This page is intentionally left blank ...
Страница 323: ...2PX 2PY 2 2 10 This page is intentionally left blank ...
Страница 371: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR Card Authentication Kit D ...
Страница 372: ...1 2 3 4 5 a a c CARD READER CARD READER HOLDER D b ...
Страница 373: ...10 b c 6 8 9 7 ...
Страница 375: ......