2PX/2PY
1-5-28
3. Remove three screws and then remove
the engine PWB.
4. Check or replace the engine PWB and
refit all the removed parts.
*: To replace the engine PWB, remove the
EEPROM (U1) from the old engine PWB
and mount it to the new engine PWB.
Figure 1-5-40
Screw
EEPROM (U1)
Engine PWB
Screw
Screw
Содержание 6026
Страница 1: ...SERVICE MANUAL Published in March 2014 842PY112 2PYSM062 Rev 2 ECOSYS M6026cidn ECOSYS M6526cidn ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 134: ...2PX 2PY 1 3 96 This page is intentionally left blank ...
Страница 237: ...2PX 2PY 1 5 51 9 Remove the scanner unit Figure 1 5 78 Scanner unit ...
Страница 275: ...2PX 2PY 1 5 89 4 Remove the paper conveying unit Figure 1 5 145 Paper conveying unit 1 2 2 ...
Страница 280: ...2PX 2PY 1 5 94 This page is intentionally left blank ...
Страница 323: ...2PX 2PY 2 2 10 This page is intentionally left blank ...
Страница 371: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR Card Authentication Kit D ...
Страница 372: ...1 2 3 4 5 a a c CARD READER CARD READER HOLDER D b ...
Страница 373: ...10 b c 6 8 9 7 ...
Страница 375: ......