2-7
Installation
54-0182 Rev. A1
18. Proceed to
Section 2.3, “Wiring the TracVision S3
to wire the TracVision S3 system. The
radome will be placed back on the baseplate using
the hardware removed in Step 2 after wiring and
initializing the system.
Forward Shipping Restraint
Installation Bolts and Washers
LNB
Figure 2-9
Forward Shipping
Restraint Storage
Installation Bolt and Washer
Rotating Plate Shipping Restraint (1 of 2)
Forward
Shipping Restraint
Rotating Plate
Shipping Restraint
Rotating Plate
Shipping Restraint
Figure 2-10
Rotating Plate Shipping
Restraint Storage
Figure 2-11
TracVision S3 Shipping Restraints
(Storage Position)